Rakvere WWTP

Project - Country: Rakvere WWTP – Estonia

Total flow rate (design): 20 000 m3/d – 2 lines of biological treatment, each 10 000 m3/d

Total flow rate (nowadays): 13 000 – 15 000 m3/d

Waste water source: ~ 90-95% domestic, 5-10% industrial (slaughter house)

Machines installed:

  • 2 x EscaMax size 4000/952/6
  • 1 x WAP-SL size 4; with launder channel
  • 1 x Ro 3.1 Ro1/780/6;

Description: Rakvere WWTP was designed in the end of 80s and was built and put into operation in 1991. In the beginning of 2000s it was partially reconstructed. In 2012 Rakvere Vesi AS launched another tender for reconstruction. That tender was won by a local contractor, which was offering Huber machinery. During last reconstruction among the other equipment screens and screenings handling system were changed. Also sludge acceptance facility was built.

Huber got the order for the pre-treatment equipment as well as sludge acceptance plant. The reason for changing old bar screens to new ones was poor separation efficiency and wear on them.

Huber machinery was started up in January 2013 and since then they are working without fails.

© Copyright - Hydropress Huber AB